eConditional Use Approval Application # 004-2015
OWNER(S): Forrest Berkley & Marcie Tyre, Trustees
AGENT(S): Greg Johnston, G.F. Johnston & Associates
LOCATION: 79 Harborside Road, Northeast Harbor
TAX MAP: 005 LOT(S): 014-006
ZONE(S): Shoreland Residential 1 (SR1)
PURPOSE: Section 3.4 & 6C.7 – Marine Structure – Pier, Ramp & Float.
SITE INSPECTION: 3:30 PM
Checklist
Land Use Zoning Ordinance of the Town of Mount Desert
** Note: All Conclusions of Law are to be read as if they are prefaced by the words “Based upon said Findings of Fact …”
SECTION 6 STANDARDS FOR USES, PERMITS AND APPROVALS
FOR REVIEW BY PLANNING BOARD
6A GENERAL PERFORMANCE STANDARDS
6A.1 |
Compatibility |
See notes below |
X See Application |
N/A |
6A.2 |
Erosion and Sedimentation Control |
See notes below |
X See Application |
N/A |
6A.3 |
Highway Safety |
See notes below |
X See Application |
N/A |
6A.4 |
Impact on Town Services |
See notes below |
X See Application |
N/A |
6A.5 |
Land Suitability |
See notes below |
X See Application |
N/A |
6A.6 |
Lighting - Outdoor |
See notes below |
X See Application |
N/A |
6A.7 |
Stormwater |
See notes below |
X See Application |
N/A |
6A.8 |
Vegetation |
See notes below |
X See Application |
N/A |
6A.9 |
Dust, Fumes, Vapors, Odors and Gases |
See notes below |
X See Application |
N/A |
|
|
|
|
|
Findings of Fact(s): The findings of fact are as presented by the applicant (see attached application and/or notes below).
VOTE: Findings of Facts (Hanley/Ashmore) 3-0-1 (Andrews in abstention)
Conclusion of Law: The proposed use is in compliance with all standards of Section 6A.
VOTE: Conclusion of Law (Hanley/Ashmore) 3-0-1 (Andrews in abstention)
Notes:
6B SPECIFIC PERFORMANCE STANDARDS FOR ACTIVITIES AND LAND USES
6B.1 |
Agriculture |
See notes below |
X See Application |
N/A |
6B.2 |
Air Landing Sites |
See notes below |
X See Application |
N/A |
6B.7 |
Excavation or filling |
See notes below |
X See Application |
N/A |
6B.8 |
Fences and Walls |
See notes below |
X See Application |
N/A |
6B.12 |
Mineral Exploration and Extraction |
See notes below |
X See Application |
N/A |
6B.15 |
Sign Regulations |
See notes below |
X See Application |
N/A |
6B.17 |
Wireless Communication Facilities |
See notes below |
X See Application |
N/A |
X N/A (Except for Section(s): 6B._______________________________)
Findings of Fact(s): The proposed use will include none of the specific activities or land uses described in section 6B, except for Applicable Sections(s) noted above.
VOTE: Findings of Facts (Hanley/Ashmore) 4-0
Conclusion of Law: Section 6B is not applicable, except for Sections(s):6B.______________________________ ____
VOTE: Conclusion of Law (Hanley/Ashmore) 4-0
Notes:
6C SHORELAND ZONING STANDARDS FOR REVIEW BY PLANNING BOARD
Land Use Standards. All land use activities within the shoreland zone shall conform with the following provisions, if
applicable.
□ N/A: Findings of Fact: The proposed lot is entirely outside the Shoreland Zone.
VOTE: Findings of Facts -
Conclusion of Law: Section 6C is not applicable.
VOTE: Conclusion of Law -
6C.1 Agriculture and Animal Husbandry See notes below See Application X N/A
6C.2 |
Archeological sites |
See notes below |
="Garamond" size="+0" color="#000000" style="font-family:Garamond;font-size:9pt;color:#000000;">t;">6C.9 |
Roads and Driveways |
See notes below |
ze="+0" color="#000000" style="font-family:Garamond;font-size:9pt;color:#000000;"> See notes below |
nbsp;
SECTION 5 CONDITIONAL USE APPROVAL
5.9 Standards
The application for Conditional Use Approval shall be approved unless the Planning Board determines that the applicant has failed to meet one or more of the standards of Section 6A and/or one or more of the applicable standards of Section 6B or 6C. In all instances, the burden of proof shall be on the applicant who must produce evidence sufficient to warrant a finding that all applicable standards have been met.
In addition, in all shoreland areas, after the submission of a complete application to the Planning Board, the Board shall approve an application or approve it with conditions if it makes a positive finding based on the information presented that the proposed use:
5.9.1 |
Will maintain safe and healthful conditions |
N/A |
X See Application |
Standard Not Met |
5.9.2 |
Will not result in water pollution, erosion, or sedimentation to surface waters |
N/A |
X See Application |
Standard Not Met |
5.9.3 |
Will adequately provide for the disposal of all wastewater |
N/A |
X See Application |
Standard Not Met |
5.9.4 |
Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other wildlife habitat |
N/A |
X See Application |
Standard Not Met |
5.9.5 |
Will conserve shore cover and visual, as well as actual, points of access to inland and coastal waters |
N/A |
X See Application |
Standard Not Met |
5.9.6 |
Will protect archaeological and historic resources as designated in the comprehensive plan |
N/A |
X See Application |
Standard Not Met |
5.9.7 |
Will not adversely affect existing commercial fishing or maritime activities in a Shoreland Commercial district |
X N/A |
See Application |
Standard Not Met |
5.9.8 |
Will avoid problems associated with floodplain development and use; (In compliance with Floodplain Management Ordinance of the Town of Mount Desert – Amended March 7, 2006.) |
N/A |
X See Application |
Standard Not Met |
5.9.9 |
Is in conformance with the provisions of Sections 6A, 6B and 6C |
N/A |
X Standard Met |
Standard Not Met |
|
|
|
|
|
Findings of Fact(s): See above.
Conclusion of Law: All requirements for Section 5.9 have / have not been met.
VOTE: Conclusion of Law (Hanley/Ashmore) 3-1 (Andrews)
FOR BOARD USE
CONDITIONAL USE PERMIT/approval
APPLICATION: #004-2015
PERMIT CONDITIONS: In addition to having all applicable federal, state, and town permits be in place prior to any construction, the following conditions apply:
Applicant shall obtain permits from the Army Corps of Engineers & DEP.
(Hanley/Ashmore) 3-1 (Andrews)
APPLICATION
APPROVED: 3/25/2015 DENIED:
(Date) (Date)
NOTE: The holder of a Conditional Use Permit/Approval must construct and operate the approved conditional use as applied for and as represented during the permitting process to the Planning Board.
NOTE: The Land Use Zoning Ordinance requires that a Conditional Use Permit/Approval must be undertaken within one year from the date of approval, or a new permit must be obtained.
THE MINUTES OF THIS PUBLIC HEARING CONSTITUTE A PART OF THE RECORD FOR THIS MATTER
SIGNATURES OF ALL VOTING BOARD MEMBERS:
Ellen Brawley, Chairman Lili Andrews, Secretary
William Hanley Dennis Kiley
David Ashmore Meredith Randolph
| |
|
|